Overview: |
A Purchase Info Record, usually called PIR, is the link between a material procured externally and the vendor that will effectively supply it. |
|
|
PIR can be maintained at the plant level or Supplying DC level or at the purchasing organization level. |
|
|
Info record can be maintained for following procurement types, which are:- Standard − Standard info record has information on standard orders (orders include details of vendor and material). This info record will include vendor’s price for supplying the particular material. Consignment − Consignment info record has information on material that is kept at ordering party premises. This info record contains vendor’s price that is to be paid for withdrawing material from consignment stock. |
|
|
Note: - Info records of Vistex enable vendor contains 0 price. |
|
Objective |
This document is to define PIR change process in S4 system |
|
Impact: |
This will impact vendor wise stock and future sale; post PIR change is done in system This will also impact on Vendor margin calculation & recovery |
|
Initiator: |
B&M Team |
|
Approver: |
Business Head and Finance Team (Bhavesh Shroff) |
|
Process |
B&M to upload following documents in MDM portal (i.e. spandhan) post approval
|
|
Format: |
|
|
Executer: |
MDM Team |
|
Pre Check: |
All site PIR should be in place and vendor A/C group should be same as article valuation class. |
|
Action: |
|
|
Post Check: |
Make sure that Old vendor should not be last PIR for any article. |
|
Change Log |
Master data -> Info record -> Change log |
MDM team will use following tCodes for maintaining PIR’s in S4.
|
t-Code |
Remark |
|
/nZMM_PIR |
Bulk PIR addition utility is available. |
|
/nME13 |
PIR Inquiry – Article wise |
|
/nME1L |
PIR Inquiry – Multiple article |
|
/nZPIR_DUMP |
PIR Report |
Points to be noted while maintaining PIR are:-
|
Business Model |
Vendor A/C group |
Article V-Class desc |
|
Out Right |
ZOUT |
Z310 |
|
Consignment |
ZCON |
Z314 |
|
Concessionaire |
ZCOR |
Z313 |
|
Sale Or Return |
ZSOR |
Z311 |
|
OR180 (Outright 180) |
ZROR |
Z312 |
|
Import Vendor |
ZIMP |
Z310 |
|
Sn |
Article Type |
PIR should be in place means |
|
1 |
Out Right |
Maintain PIR with Standard flag as ‘0’ |
|
2 |
Consignment |
Maintain PIR with Consignment flag as ‘2’ |
|
3 |
Concessionaire |
Maintain Rack-Jobber PIR |
|
4 |
Sale Or Return |
Maintain PIR with Standard flag as ‘0’ |
|
5 |
Returnable outright |
Maintain PIR with Standard flag as ‘0’ |
|
6 |
Import Vendor |
Maintain PIR with Standard flag as ‘0’ |
Given that multiple PIRs can be available in the system at any given time for an article plant combination. So the highest priority records with the latest timestamp is to be considered as the active vendor in following precedence
Change PIR will impact on new transaction only. It will not reflect in open transaction.
|
Transaction |
In case of Missing PIR |
|
PO or RPO |
System will restrict user on creating PO or RPO |
|
STO |
System will restrict user on raising STO |
|
PIC or SAV |
System doesn’t look for PIR, so “#” (means *Blank) value will appear in vendor column of stock report |
|
Sales or Sale Return (POS / eCom) |
Sales posting will stuck in S4. |
|
BW – Report |
System consider latest PIR vendor for reporting. |
|
Sn |
System |
Impact |
Comment |
|
1 |
POS |
No |
No impact |
|
2 |
CRM |
No |
No impact |
|
3 |
eScheme |
No |
No impact |
|
4 |
eVRF |
No |
No impact |
|
5 |
Hybris |
No |
No impact |
|
6 |
WMS |
No |
No impact |
|
7 |
B2B |
Yes |
Vendor wise stock report consider latest PIR |
|
8 |
Loyalty |
No |
No impact |
|
9 |
BW |
Yes |
Vendor wise stock , Sales |
|
10 |
Vistex |
Yes |
Margin and Recovery report |
|
11 |
DIAL + MIAL |
No |
No impact |
Tobe answer by TCS
|
Q.1 |
What will be the impact of PIR change on reports in S4, BW & B2B – For Historic Sales |
|
A.1 |
BW shows always with Latest PIR only in Report. In History sales transaction NO impact of PIR change. |
|
|
|
|
Q.2 |
What will be the impact of PIR change on reports in S4, BW & B2B – For Future Sales |
|
A.2 |
It will reflect with Valid from Date of PIR in Sales Report. |
|
|
|
|
Q.3 |
What will be the impact of PIR change on reports in S4, BW & B2B – For Historic Inventory |
|
A.3 |
|
|
|
|
|
Q.4 |
What will be the impact of PIR change on reports in S4, BW & B2B – For Future Inventory |
|
A.4 |
|
|
|
|
|
Q.5 |
Should Old PIR be closed? If Yes what will be the impact? If not what will be the impact? |
|
A.5 |
NO. We will take up as Cleaning Activity |
|
|
|
|
Q.6 |
If vendor Business model is getting changed can this be managed by change in PIR by using the same articles? |
|
A.6 |
Yes, Any Business model change scenario, It needs to create a new vendor & new PIR set up. So in any condition, It will treat as new PIR creation process. Also If changes like Consignment to concessionaire or vice versa, It will change PIR to Rack jobber data. |
|
|
|
|
Q.7 |
If vendor is getting changed can this be managed by change in PIR by using the same articles? |
|
A.7 |
No, It will route through new PIR creation only. No change recommendation in existing one. |
|
SSL Business Approval |
|||
|
|
|||
|
Sr. No. |
Date |
Name |
Signature |
|
1 |
|
Planning Head - Archish Raghunathan <Archish.Raghunathan@shoppersstop.com> |
|
|
2 |
|
Project Head - Krishnan Parameswaran <Krishnan.Param@shoppersstop.com> |
|
|
3 |
|
Project Head - Mandavi Singh <Mandavi.Singh@shoppersstop.com> |
|
|
4 |
|
Bhavesh Shroff <bhavesh.Shroff@shoppersstop.com> |
|
|
5 |
|
Governance & Compliance - Ramnath Kamath <ramnath.kamath@shoppersstop.com> |
|
|
|
NAME |
DATE |
|
Initial Draft |
Vishal Varlyani <Vishal.Varlyani@shoppersstop.com> |
07-07-2020 |
|
Reviewer |
Uttam Rawat <Uttam.Rawat@shoppersstop.com> |
07-07-2020 |
|
TEAMS Path |
DISHA Collaboration -> General -> 03 Realize -> 3.8 Draft SOPs for B&M -> 3.8.1 To be release for DocuSign |