B&M SOP 9 - Change in supplying DC (Replenishment)

B&M SOP 9 - Change in supplying DC (Replenishment)

Suplying DC


Change in Supplying DC for Replenishment





Table of Contents

1. Change in Supplying DC    

1.1. Approach    

1.2. Prerequisite    

1.3. Impact on downstream system    





  1. Change in Supplying DC


  1. Approach


Objective:

This document is to define a process of change in supplying DC for replenishment

Overview:

Currently from replenishment point of view, SSL is maintaining supplying DC at “Site Level” or “MC – Site Level” only. 

Note: Before change in supplying DC either at “Site Level” or “MC – Site Level”. Make sure that effected article – site data are updated again in system.

Impact:

Historical transaction will not change (e.g. STO/PO.)

Approval:

B&M need to take approval from following team before requesting “Change in supplying DC”

  • B&M Head
  • Accounts & Finance
  • Sales Tax
  • SCM Team
  • WMS (IT) Team

Prerequisite:

B&M team need to make sure that for new Supplying DC

  1. PIR/Cost is maintained 
  2. MRP (Price) is maintained
  3. Vistex margin (if any) maintained

Initiator:

B&M to upload data and approval mail in MDM portal (i.e. spandhan) in below format.

Format:

Executer:

MDM Team

Action:

Maintain “Article – Site - Supplying DC” data in S4.

Maintain supplying DC at “Site Level” or “MC – Site Level” in S4.

Note:

Till the time this activity didn’t get completed, replenishment job should be on hold.







  1. Impact on downstream system


Sn

System

Impact

Comment

1

POS

No

No impact

2

CRM

No

No impact

3

eScheme

No

No impact

4

eVRF

No

No impact

5

Hybris

No

No impact

6

WMS

No

No impact

7

B2B

No

No impact

8

Loyalty

No

No impact

9

BW

No

No impact

10

Vistex

Yes

Depends on data

11

DIAL + MIAL

No

No impact











Sign-off

SSL Business Approval


Sr. No.

Date

Name

Signature

1


Planning Head - Archish Raghunathan <Archish.Raghunathan@shoppersstop.com>


2


Project Head - Krishnan Parameswaran <Krishnan.Param@shoppersstop.com>


3


Project Head - Mandavi Singh <Mandavi.Singh@shoppersstop.com>


4


Governance & Compliance - Ramnath Kamath <ramnath.kamath@shoppersstop.com>


5


Purnima Shetty <Purnima.Shetty@shoppersstop.com>


6


Junaid Kuravle <Junaid.Kuravle@shoppersstop.com>





NAME

DATE

Initial Draft

Vishal Varlyani <Vishal.Varlyani@shoppersstop.com>

09-10-2020

Reviewer

Uttam Rawat <Uttam.Rawat@shoppersstop.com>

09-10-2020



TEAMS Path

DISHA Collaboration -> General -> 03 Realize -> 3.8 Draft SOPs for B&M -> 3.8.1 To be release for DocuSign



    • Related Articles

    • B&M SOP 7 - Change in Vendor or Vendor business model

      Vendor Change Change in Vendor business model Or Vendor Table of Contents 1. Vendor Change 1.1. Approach 1.2. Old vendor activities. 1.3. New vendor activities. 1.4. Impact on downstream system 2. Sign-off Vendor Change SSL has created following ...
    • B&M S4 FAQ

      S 4 F A Q s 1 ERROR TYPE PO CREATI ON This error indicates that one or more of the mandatory fields are currently blank in the upload file Purchase Group, Vendor, Article, Site, PO Qty are the mandatory fields which need to be filled in by the user 2 ...
    • B&M SOP 4 - Impact of Change in PIR on Sales and Inventory

      PIR Maintainance Impact of Change in PIR Table of Contents 1. PIR Maintenance 1.1. Approach 1.2. Highlights: 1.3. Impact on transaction: 1.4. Impact on downstream system 1.5. Question and Answers: 2. Sign-off PIR Maintenance Overview: A Purchase Info ...
    • B&M SOP 8 - TAX Change

      TAX Maintainance TAX Maintenance (Trade) Table of Contents 1. TAX Maintenance (Trade) 1.1. Approach 1.2. Impact on downstream system 2. Sign-off TAX Maintenance (Trade) The Harmonized System Nomenclature (HSN) code is the 8 digit uniform code used ...
    • B&M SOP 5 - Change in article hierarchy

      Change in Article Hierarchy Change in Article Hierarchy Table of Contents 1. Change in article hierarchy 1.1. Impact 1.1.1. Purchase Group and Authorization matrix: 1.1.2. PIR 1.1.3. Open PO (Released & Unreleased) 1.1.4. L4 vs Characteristic and MC ...