Impact of change in EAN

Impact of change in EAN

EAN Maintainance


EAN/UPC Maintenance





Table of Contents

1. EAN (i.e. UPC) Maintenance    

1.1. Approach    

1.2. Note:    

1.3. Impact on downstream system    

2. Sign-off    





  1. EAN (i.e. UPC) Maintenance


  1. Approach


Objective:

This document is to define EAN change process in S4 system

Rule:

If inventory is present against an article then EAN deletion cannot be done

Approval:

B&M need to take approval from SCM Team before requesting EAN deletion.

SCM - Purnima Shetty <Purnima.Shetty@shoppersstop.com>

Initiator:

B&M to upload EAN data and Approval mail in MDM portal (i.e. spandhan) in below format.

Format:

Executer:

MDM Team

Action:

Maintain EAN in S4

After EAN Change

Article detail will re-flow to downstream system (i.e. POS, hybris, WMS…) with New EAN #

Change Log

  • Master data -> Goto additional data -> Additional EANs
  • Environment -> Display changes



MDM team will use following tCodes for maintaining EAN’s in S4.

Custom t-Code

Base t-Code

Remark

/nZMM_EAN


Bulk EAN addition utility is available for mapping multiple EAN 


/nMM42

As of now, bulk EAN delete utility is not available in S4.





  1. Note:


  1. EAN # should not be *Blank in Article master


  1. As per design, system work in following fashion while article creation.

While Article creation

Private Brand

Non Private Brand

If EAN# Present in article upload data

System will map running EAN# from “S4 configuration”.


System will ignore EAN # present in article upload data.

System will MAP EAN # present in article upload data.

If EAN# is not present in article upload data

System will map running EAN# from “S4 configuration”.

System will MAP Old Article # as EAN # in article Master.


  1. Impact on downstream system


Sn

System

Impact

Comment

1

POS

Yes

Article detail will reflow with new EAN

2

CRM

No

No impact

3

eScheme

No

No impact

4

eVRF

No

No impact

5

Hybris

Yes

Article detail will reflow with new EAN

6

WMS

Yes

Article detail will reflow with new EAN

7

B2B

Yes

Article detail will reflow with new EAN

8

Loyalty

No

No impact

9

BW

Yes

Article detail will reflow with new EAN

10

Vistex

No

No impact

11

DIAL + MIAL

Yes

Article detail will reflow with new EAN (if listed)



  1. Sign-off

SSL Business Approval


Sr. No.

Date

Name

Signature

1

21-07-2020

Planning Head - Archish Raghunathan <Archish.Raghunathan@shoppersstop.com>


2

21-07-2020

Project Head - Krishnan Parameswaran <Krishnan.Param@shoppersstop.com>


3

21-07-2020

Project Head - Mandavi Singh <Mandavi.Singh@shoppersstop.com>



    • Related Articles

    • B&M SOP 7 - Change in Vendor or Vendor business model

      Vendor Change Change in Vendor business model Or Vendor Table of Contents 1. Vendor Change 1.1. Approach 1.2. Old vendor activities. 1.3. New vendor activities. 1.4. Impact on downstream system 2. Sign-off Vendor Change SSL has created following ...
    • Impact of change in vendor schema

      Change in Vendor Schema Change in Vistex Flag Table of Contents 1. Change in vendor schema (i.e. Vistex Flag) 1.1. Approach 1.2. Impact on downstream system Change in vendor schema (i.e. Vistex Flag) Document is valid only for Vendors Migrated from ...
    • B&M SOP 4 - Impact of Change in PIR on Sales and Inventory

      PIR Maintainance Impact of Change in PIR Table of Contents 1. PIR Maintenance 1.1. Approach 1.2. Highlights: 1.3. Impact on transaction: 1.4. Impact on downstream system 1.5. Question and Answers: 2. Sign-off PIR Maintenance Overview: A Purchase Info ...
    • B&M SOP 8 - TAX Change

      TAX Maintainance TAX Maintenance (Trade) Table of Contents 1. TAX Maintenance (Trade) 1.1. Approach 1.2. Impact on downstream system 2. Sign-off TAX Maintenance (Trade) The Harmonized System Nomenclature (HSN) code is the 8 digit uniform code used ...
    • B&M SOP 9 - Change in supplying DC (Replenishment)

      Suplying DC Change in Supplying DC for Replenishment Table of Contents 1. Change in Supplying DC 1.1. Approach 1.2. Prerequisite 1.3. Impact on downstream system Change in Supplying DC Approach Objective: This document is to define a process of ...